久久久久精品亚洲18国产成人精品无码AV综合_亚洲国产成人精品久久久久av无码综合色_亚洲精品国产无码午夜福利成人毛片中文字幕_亚洲国产婷婷综合在线精品18禁伊人网_亚洲国产综合91精品久久久久久免费黄aa网站_国产黄A级三级无码A成人毛片一区二区三区_91麻豆va国产精品久久久久久精品免费观看_99re国产乱码欧美日本韩高清视频一区二区三区

Brick making machine industry NEWS

Your location:HOME > Information dynamic  > News > Brick making machine industry

What are the correct operating methods for hydraulic systems that brick machine manufacturers tell y

source:www.bysyh.com.cn         Release time:2024-06-25 Return list

    In the new type of brick machine manufacturers, hydraulic systems are widely used because of their good stability and strong operating power. However, in the production of hydraulic brick machines, as the main power system of brick machine production, if there is a problem with the hydraulic system, it will directly affect the production of the whole machine. On the one hand, we need to avoid discovering such faults, which requires us to study relevant operation and maintenance knowledge seriously. On the other hand, we also need to master some knowledge of hydraulic system fault maintenance. When we really encounter some problems, we can discover and handle them in a timely manner to avoid increasing the fault and causing greater losses. In order to enable investors to operate better, we will introduce the correct operation methods of hydraulic systems in brick machine manufacturers.


    The correct operation methods for various debugging projects and systems are carried out item by item from parts to the entire system, namely: component, single machine, unit linkage, etc. The brick machine manufacturer tells you that the debugging of the hydraulic system of the hydraulic non burning brick machine should generally be carried out in the order of pump station debugging, system debugging (including pressure and flow rate, i.e., speed debugging of the actuator, and action sequence debugging). The hydraulic system of a brick press equipped with an accumulator should have the working pressure setting value of the accumulator consistent with the working pressure value of the actuator it controls. When the accumulator is installed in the hydraulic pump station of the non burning brick machine, its pressure adjustment value should be 0.4-0.7 MPa lower than the set pressure value of the relief valve.


    Run without load for 10-20 minutes, and when starting the hydraulic pump of the non burning brick machine, loosen the relief valve or place it in the unloading position to allow the system to run without pressure. Observe the magnitude of the unloading pressure; Whether the operation is normal; Whether there is harsh noise; Whether the liquid level in the oil tank has too much foam, and whether the oil level is within the specified range.
久久久久精品亚洲18国产成人精品无码AV综合_亚洲国产成人精品久久久久av无码综合色_亚洲精品国产无码午夜福利成人毛片中文字幕_亚洲国产婷婷综合在线精品18禁伊人网_亚洲国产综合91精品久久久久久免费黄aa网站_国产黄A级三级无码A成人毛片一区二区三区_91麻豆va国产精品久久久久久精品免费观看_99re国产乱码欧美日本韩高清视频一区二区三区